N000179-3

Grace Napolitano (D-CA31)

Tax Staffer: Joe Sheehy, joe.sheehy@mail.house.gov.

District Highlights (Through 2023)

  • 5 projects
  • 42,627,351 in NMTC allocation
  • 61,466,571 total project financing
  • 275 FTE jobs created or retained
  • 335 construction jobs created

5

projects

$42,627,351

NMTC Allocation

$61,466,571

in total project financing

275

FTE jobs

335

construction jobs

NMTC Project Profiles (Inside the District)

Maxima Products (2012)

Azusa, CA
The construction of a office building for Maxima Products, a manufacturer of high quality and economical Heavy Duty Mobile Column Lifts ranging from 16,500 lbs–18,500 lbs lifting capacity per column.