The NMTC issuer has offered to extend the tax benefit beyond the 5 MW plant under construction and would do additional NMTC’ s on a second plant of up to 2 MW if an expansion or second location was possible
The NMTC issuer has offered to extend the tax benefit beyond the 5 MW plant under construction and would do additional NMTC’ s on a second plant of up to 2 MW if an expansion or second location was possible