RES – Magnolia

Revolution Energy Solutions LLC headquartered in Washington DC decided to install anaerobic digesters and a CHP plant to convert pig manure into usable energy on a larger pig livestock farms in Magnolia County, NC.

Investment

  • NMTC Amount: $6,860,000
  • Total Project Cost: $13,133,000

IMPACT

  • 4 FTE jobs
  • 15 construction jobs
  • Rehabilitation of a vacant or under-utilized historic structure.

Investor

Project Description

Revolution Energy Solutions LLC headquartered in Washington DC decided to install anaerobic digesters and a CHP plant to convert pig manure into usable energy on a larger pig livestock farms in Magnolia County, NC. RES ordered 2G Energy Inc. to manufacture, supply, and to install a biogas CHP plant for their first project in Magnolia. The equipment is a 2G patruus Twin Pack with 2 x 250 ekW/h fully integrated MAN biogas optimized engines producing a total of 500 ekW/h or 4,150 MW p.a. Electrical Power and 626 kWh/th of Thermal Power.

This fully containerized modular Twin Pack biogas CHP System is guaranteed less expensive than any traditional inside building installation. The system configuration also provides much more operational flexibility for the plant operator, and system efficiency can be managed much easier.

Containerized CHP modules from 2G Energy Inc. provide many advantages. All heat exchanger and heat recovery systems are fully integrated. Heat circulation piping and distribution are an integral part of 2G®’s containerized solutions including insulated piping and pre-plumbing. The floor plan allows for easy access to all system components, comfortable movement, and efficient service & maintenance. 2G® modules are custom and purpose built. Standard connections and terminations are used throughout to minimize the installation and connection effort. All units are designed for extremely fast integration and very easy operation. 2G Energy Inc. also provided the complete gas treatment package, as well as utility grid interconnection switchgear.

MAP

Address: 1001 Ezzell Road, Magnolia, NC 28092

Census Tract: 37061090801

Other North Carolina Projects

One of Raleigh’s most important buildings in the first part of the 1900s, this building housed the Evening Times, which later became the Raleigh Times newspaper. The Times building possesses

NMTC financing helped create a mixed-use project inside a former Albemarle hosiery mill.
In 2017, construction on a new child-development facility at The Renaissance public-housing community.

Construction of a new state-of-the-art sawmill facility in Enfield, North Carolina.