HarbisonWalker International Plant

Investment

  • NMTC Amount: $8,000,000
  • Total Project Cost: $8,240,000

IMPACT

  • 50 FTE jobs

Investor

Project Description

The project at Fairfield will include the removal of antiquated equipment and installation of new, modernized manufacturing equipment. The current plant configuration and equipment are not setup for use in manufactuing magnesia carbon refractrories. The initial plant facility was closed in 2019 and approximately 100 jobs were lost when HWI made the entrepreneurial decision to exit the carbon bake industry due to the lack of demand for carbon bake refractory products used in the aluminum industry.

MAP

Address: 2595 Ensley-Pleasant Grove Road, Fairfield, AL 38934

Census Tract: 1073013901

PDF Profile

Other Alabama Projects

The 5th phase in a 5-phase commercial development located at the Project site in Foley, AL.
Financing for Arista Aviation, a FAA-certified Part 145 repair station, providing maintenance, repair and overhaul services for rotary wing platforms, including airframes and avionics.
A pipe manufacturing plant expanded operations and brought skilled jobs to Selma, AL
Through NMTCs, UB Community Development was able to provide this small business with the adequate funding needed to complete their desired upgrades.